Post-construction cleaning in Clarke, Milton
We specialize in post-construction cleaning in Clarke, Milton.
A Clarke post-construction clean must follow actual completed work, with the selected surfaces released by the trades. An apartment's published finishes are a planning reference, not evidence that renovation is underway or that a unit is ready today.
Build your post-construction cleaning quoteCall 289-813-7484

Confirm completed installation before cabinet-area cleaning
The Miltonian description lists designer cabinetry with under-mount lighting. If comparable features have just been installed in your home, identify unfinished electrical or cabinet work and obtain the contractor's release before scheduling the selected cleaning. Explain the dust condition and protect any areas still under installation; a fitted-kitchen brochure cannot establish that trades have finished.
Identify the new floor product and remaining debris
Its suite specification also describes luxury plank flooring and floor-to-ceiling windows. For an actual completed project, provide the installed floor's care instructions and identify accessible glass separately from protected or high sections. Building offcuts, leftover materials, adhesive removal and repairs are not automatically part of ordinary dust cleaning. Have the responsible contractor remove its debris and clarify any specialist residue before the visit.
Scope completed construction work separately
This is a standalone package for a finished, safe and accessible work area. Bathrooms, kitchens, basement work and interiors are separate selections.
Selected work
- Repeated top-down passes for fine construction dust
- Safe, removable construction residue on reachable room surfaces
- Reachable baseboards and light fixtures wiped
- Bedroom and living-area floors vacuumed and washed after the surfaces above them
- Above-ground bedroom and living-area cleaning; bathrooms and kitchens are selected separately
Scope limits and extras
- Construction waste, tools and hazardous materials
- Unfinished or unsafe work areas
- Repairing damage, high-access work or specialist remediation
Your address, selected work, final quote and appointment availability are confirmed before booking. Basic is recurring maintenance after an initial Deep or other suitable service.
Example quote: adjust the rooms and tasks
Post-construction cleaning starts from $385 for up to 1,000 sq ft. Separately, recurring Basic cleans start from $89 for one bedroom before eligible discounts, after an initial Deep or other suitable clean.
Illustrative house selection: 900 above-ground sq ft, with one full bathroom and the main kitchen selected. Basement work, appliance interiors and other extras remain separate.
$435 before HST · $491.55 including HST. This example uses the selections above. Your actual scope determines the quote.
Use the actual home measurements and selections. Extra rooms and optional tasks must be selected. The calculator retains the full reference code for your enquiry.
Post-construction cleaning questions for Clarke
Can the clean be booked solely from the developer's finish list?
No. Confirm what work was actually completed, the present condition and which surfaces have been released.
Does post-construction cleaning include leftover flooring pieces or installation repairs?
No. Arrange construction-debris removal and repairs separately, and agree the actual accessible dust-cleaning tasks.